recent projects | Ormond Civil PTY LTD

commercial formwork sydney

Sydney Water – Canal Realignment

August 24, 2018

Recently completed Steel fixing and shotcreting for Sydney Water’s Canal Realignment – showing the diversity and reliability of Ormond Civil.

Read More
concrete piles sydney

Westmead – Temporary Anchoring and Shotcrete

March 6, 2018

ORMOND Civil constructed the 400 temporary anchors and 4000m2 of Shotcrete at Westmead. With close contact with the excavation contractor Ormond helped expedite the construction program.

Read More
concrete formwork sydney

Granville – Bored Piles, Secant Piles, Anchoring and Shotcrete

March 6, 2018

ORMOND Civil has constructed the shoring walls at Granville next to the railway line. This project features 5 basements requiring 500 temporary anchors and over 4,000m2 of shotcreting works, detailed excavation of the shoring wall, capping beamand De-watering. The scale of this job truly tests ORMOND Civil’s ability to maintain productivity and quality within our works.

Read More
temporary shoring

John Holland Macquarie Park – Temporary Anchoring and Shotcrete

March 6, 2018

ORMOND Civil has completed the Supply and Installation of Temporary Anchors and Shotcreting at Macquarie Park. Ormond Civil’s full time site engineers ensured daily ITP, QA and Stressing records were maintained.

Read More
formwork sydney

Zetland – Hollow Bar and Anchoring

March 6, 2018

ORMOND Civil was responsible for installation of up to 500kN Hollow Bar Anchors and Waler Beams spanning across the entire shoring wall. ORMOND Civil could utilise the design of the Hollow Bar Anchors in the contaminated soil comprising of silty sand to provide the most cost effective solution.

Read More
shotcrete wall

Springwood – Gun Finish Shotcrete

March 6, 2018

Ormond Civil was contracted to undertake both Shotcrete and Anchoring in the Blue Mountains. The gun finish option selected by the client was a more economical choice compared to a float finish shotcrete wall.

Read More
permanent steel formwork

Castle Hill – Horizontal Drilling for Drainage

March 6, 2018

ORMOND Civil was awarded the Coring & Anchor Destressing Work for the new railway line running through Castle Hill Station. ORMOND Civil was responsible for the Supply and Installation of Sub-horizontal Drains and Anchor Destressing for the shoring wall around the Station Box. Given the strict safety regulations for government jobs, ORMOND Civil was able

Read More
steel piles sydney

Glebe – Sheet Piling, Anchoring and Shotcreting

March 6, 2018

Sheet piles were driven through Clay and Sandy material and terminated at rock. ORMOND Civil has installed hollow bar anchors and a load bearing shotcrete wall onto the waterproofing blanket and Sheet Piles.

Read More
Westconnex concreting

Westconnex – Shotcreting

March 6, 2018

ORMOND Civil has carried out concrete works for various clients across the Westconnex. With plant inducted onto the project and the focus on quality, safety and reliability, Ormond Civil has thrived in the environment.

Read More