Ormond Civil successfully delivered a complex deep excavation and shoring project in Bellevue Hill, NSW, providing a full design and construct solution tailored to challenging site conditions.

The project involved a split-level excavation driven by steep natural topography, requiring precise engineering, staged construction, and advanced ground support systems.

With limited access, deep sand layers, and strict structural requirements, this project demanded a high level of planning, coordination, and execution.

Scope of Works

Ormond Civil delivered a comprehensive excavation support solution, including:

  • Temporary and permanent sheet piling up to 12 metres deep
  • Installation of hollow bar anchors in sand conditions
  • Internal bracing and waler systems for structural stability
  • Integration of permanent and temporary works into a unified system
  • Full design and construct delivery

This approach ensured both construction-phase safety and long-term structural performance.

Key Challenges

This project presented several technical and environmental challenges:

  • Steep site topography requiring split-level excavation
  • Deep excavation within a tight residential environment
  • Installation of permanent anchors in confined spaces
  • Sand-dominated ground conditions, increasing instability risks
  • Coordination of temporary and permanent systems without delays

Ormond Civil addressed these through staged construction sequencing, advanced engineering design, and close on-site coordination.

Our Approach

The project began with detailed design development, ensuring the shoring system met both temporary excavation requirements and permanent structural needs.

Key execution steps included:

  • Staged sheet piling installation aligned with excavation depths
  • Precision installation and stressing of hollow bar anchors
  • Deployment of internal walers and bracing systems for lateral support
  • Continuous monitoring to maintain stability in sand-heavy conditions

This methodical approach ensured maximum safety, efficiency, and structural integrity throughout the project lifecycle.

Results & Outcomes

  • Delivered on time and within program expectations
  • Achieved the required excavation profile and structural outcomes
  • Maintained zero safety incidents
  • No productivity delays despite complex site constraints

The successful delivery highlights Ormond Civil’s ability to execute high-risk excavation works with precision and control.

Capability Highlight

This project demonstrates Ormond Civil’s expertise in:

  • Deep excavation support systems
  • Working in sand and unstable ground conditions
  • Managing confined and high-risk residential sites
  • Delivering design & construct civil solutions

It reinforces the company’s reputation for delivering safe, efficient, and technically complex civil works while maintaining program certainty.

Why This Project Matters

Projects like Bellevue Hill position Ormond Civil as a trusted contractor for:

  • Developers
  • Builders
  • Engineers
  • Project managers

Looking for a partner capable of handling complex excavation and shoring systems in challenging environments.

Ready to Start Your Project?

Speak with our team about tailored civil construction solutions delivered safely, efficiently, and to the highest standard.

Call: 0406 009 417
Email: info@ormondcivil.com.au