Ormond Civil delivered a design and construct shoring solution in Queanbeyan, NSW, supporting a complex excavation project characterised by challenging ground conditions and multiple site constraints.
The project required the integration of temporary ground support systems, including piling, anchoring, and shotcrete, to ensure excavation stability while also accommodating future removal of temporary elements.
With unstable subsurface conditions and external constraints impacting construction sequencing, the project demanded a high level of technical expertise, flexibility, and coordination to achieve the desired structural and architectural outcomes.
Scope of Works
Ormond Civil provided a complete, end-to-end excavation support solution, including:
- Design and construction of 600mm diameter shoring piles
- Installation of temporary anchors (removable system)
- Construction of capping beams
- Application of shotcrete with a high-quality gun finish
- Full design and construct delivery
This integrated approach ensured that all temporary and permanent elements worked together seamlessly, maintaining stability throughout the excavation and construction process.
Key Challenges
The Queanbeyan project presented several complex technical challenges that required adaptive construction methods and careful execution.
Unstable Ground Conditions
One of the primary challenges was drilling through collapsing ground material, which significantly increased the risk of bore instability during piling operations. Maintaining structural integrity during drilling required constant monitoring and adjustment of techniques.
Variable Subsurface Materials
At depths of approximately 7–8 metres, the team encountered gravel and cobblestone layers, which disrupted piling progress and required modifications to drilling methods. These inconsistent ground conditions added complexity to both productivity and equipment performance.
Removable Anchoring System
The project required the installation of temporary anchors designed for future extraction, adding another layer of engineering complexity. These anchors needed to perform under load during construction while being removable without compromising the final structure.
Site Constraints & Services
A low-voltage line running across the site introduced additional restrictions, requiring careful coordination and planning to ensure safety and uninterrupted progress.
Together, these challenges demanded a flexible and highly controlled construction strategy.
Our Approach
To successfully deliver the project, Ormond Civil implemented a methodical and adaptive construction methodology, tailored to the unique site conditions.
Adaptive Drilling Techniques
The team adjusted drilling methods in real time to manage collapsing ground conditions, ensuring bore stability and maintaining production efficiency despite difficult subsurface environments.
Engineered Temporary Anchors
Anchors were carefully designed and installed to provide reliable structural support during excavation, while also allowing for safe and efficient future removal. This required precise engineering and installation practices.
Coordinated Site Management
Works were carefully sequenced to account for live site constraints, including the presence of overhead services. Close coordination ensured that all activities were carried out safely and without disruption.
High-Quality Shotcrete Application
Shotcrete was applied using a gun finish technique, delivering both structural integrity and a clean, consistent surface finish that met project specifications.
This approach enabled Ormond Civil to maintain control, safety, and efficiency throughout all stages of the project.
Results & Outcomes
Despite the complexity of the site conditions and technical requirements, Ormond Civil successfully delivered the project to a high standard.
- Project completed within the 6-month program
- Achieved all architectural and structural requirements
- Delivered with zero safety incidents
- No productivity delays throughout construction
- Maintained excavation stability across all stages
The final outcome demonstrates the effectiveness of a well-coordinated design and construct approach, even in highly challenging environments.
Capability Highlight
This project reinforces Ormond Civil’s capability in delivering complex excavation support systems across NSW, particularly in environments where ground conditions and site constraints present significant risks.
Key strengths demonstrated include:
- Expertise in piling and shoring systems in unstable ground
- Delivery of temporary anchoring systems with future flexibility
- Integration of piling, shotcrete, and structural support systems
- Ability to maintain safety, productivity, and program certainty
The Queanbeyan project highlights Ormond Civil’s ability to adapt to unpredictable conditions while maintaining high-quality outcomes.
Why This Project Matters
Projects like this position Ormond Civil as a trusted contractor for:
- Developers
- Builders
- Engineers
- Project managers
who require reliable excavation support solutions in challenging ground conditions.
The successful delivery of this project demonstrates Ormond Civil’s commitment to engineering excellence, safety, and performance across every stage of construction.