Key project details:
- 220 piles, ranging from 450mm to 750mm in diameter
- 20 temporary anchors securing the foundation
- 250m of capping beam installed
- 1250m² of shotcrete for robust reinforcement
- 10 braces ensuring structural stability
- Three seamless contiguous walls built to exact specifications.
The project’s close location to historical buildings required meticulous care when drilling to preserve their integrity.




