Shotcrete Works for Three Basement Excavations in Lyneham
Ormond Civil completed shotcrete works across three basement excavations as part of a larger construction project in Lyneham. The scope involved applying reinforced shotcrete to the exposed faces of the excavation retention systems, creating a continuous concrete finish between and
Piling, Shotcrete & Capping Beam Installation – Wilton
Ormond Civil successfully delivered a comprehensive piling, shotcrete, and capping beam installation package for the Wilton Project in NSW. The works formed a critical part of the foundation and shoring system required to support ongoing structural construction. The project demanded precision
Main South Road, Aldinga SA
For this major road duplication project, Ormond Civil was responsible for providing advanced slope stabilisation and retaining structures using soil nailing and shotcrete, a combination of techniques that reinforces embankments and cuttings to prevent erosion and ground movement.Using our specialist rigs and equipment, our
Yanchep Railway Extension, WA
The Yanchep Rail Extension is the final stage of the Joondalup Line from Butler, 14.5 kilometres north to Yanchep to help support ongoing growth in the area and reduce congestion.Ormond Civil collaborated with NEWest, a CPB and Downer JV, to
Sydney Football Stadium, NSW
The newly redeveloped Sydney Football Stadium is a modern, world class venue, positioning Sydney as an international sporting and entertainment destination of choice for sporting and entertainment events.Ormond Civil completed 500m of Capping Beam, 2400m2 of Shotcrete, Design & Construct
Waterfall Train Station, NSW
Ormond Civil collaborated with Laing O’Rourke on upgrades along the rail corridor of the T4 Illawara commuter and goods railway line, which provides services between Sydney and the Illawarra & South Coast regions.Works centered around the suburb of Waterfall, which
Pitt Street Metro, NSW
Ormond Civil collaborated with CPB Contractors on the construction of the new Pitt Street Station in the Sydney CBD, part of the expansion of Sydney’s metro rail network.Following demolition and excavation of the site, improvement works were required to the
Darlington, SA
Ormond Civil collaborated with Laing O’Rourke & Fulton Hogan on the shotcrete works for the Darlington Upgrade Project which was part of Adelaide’s North-South Corridor infrastructure improvement strategy.This corridor has been identified as one of Adelaide’s most important transport corridors
Woollahra, NSW
Key project details:220 piles, ranging from 450mm to 750mm in diameter20 temporary anchors securing the foundation250m of capping beam installed1250m² of shotcrete for robust reinforcement10 braces ensuring structural stabilityThree seamless contiguous walls built to exact specifications.The project’s close location to