Key Project Details: – 220 piles, ranging from 450mm to 750mm in diameter – 20 temporary anchors securing the foundation – 250m of capping beam installed – 1250m² of shotcrete for robust reinforcement – 10 braces ensuring structural stability – Three seamless contiguous walls built to exact specifications
The project’s close location to historical buildings required meticulous care when drilling to preserve their integrity.
Working within an existing building presented tight spaces, demanding specialized machinery and equipment to navigate while maintaining high efficiency and quality.